ITI delivered a large-scale Battery Energy Storage System (BESS), providing critical grid stabilization and peak shaving capabilities for a power authority.
LOCATION
Saskatchewan
MANUFACTURING LEAD TIME
28 weeks from release
INDUSTRY
Power Generation & Utilities
SOLUTIONS
PROJECT OVERVIEW
The integrated package combines 10MVA skid mounted MV and LV switchgear lineups with integrated 500kVA station service transformers, DC backup systems, and distribution. The comprehensive solution included 8MVA power conversion transformers, PCS electrical houses, and specialized engineering studies to facilitate seamless utility protection and SCADA integration. The system delivers grid stabilization, peak shaving, and robust protection and control to improve reliability.