ITI delivered unitized substation skids that enable rapid deployment and scalable capacity for AI and data center critical infrastructure.
LOCATION
North Dakota
MANUFACTURING LEAD TIME
18 weeks from release for first shipment
INDUSTRY
AI & Data Infrastructure
SOLUTIONS
PROJECT OVERVIEW
The integrated design combines medium voltage and low voltage switchgear, step-down transformers, and prewired interconnections to simplify site work. Engineered for rapid deployment and operational flexibility, the skids deliver dependable performance while streamlining commissioning to meet tight schedules and complex specifications.