ITI delivered a large-scale Battery Energy Storage System (BESS), providing critical grid stabilization and peak-shaving capabilities for SaskPower.
LOCATION
Saskatchewan
MANUFACTURING LEAD TIME
28 weeks from release
INDUSTRY
Power Generation & Utilities
SOLUTIONS
PROJECT OVERVIEW
ITI designed, manufactured, and commissioned a 20MW Battery Energy Storage System (BESS) for SaskPower, featuring two 10MVA skid-mounted switchgear lineups with integrated 500kVA station service transformers, DC backup systems, and distribution. The comprehensive solution included four 8MVA power conversion transformers, six PCS electrical houses, and specialized engineering studies to facilitate seamless utility protection and SCADA integration. The completed system provides essential grid stabilization, peak-shaving capabilities, and robust protection and control, significantly enhancing grid reliability.